Loading...
Product added to your list. To view the list, Click Here

Submeter, Indoor, DIN rail mount, Universal Voltage, 3 Phase 3 Wire/4 Wire, Modbus RTU, Electric Meter, USE Split Core CTs

4KUMR-M

Series 4000 Submeter, Indoor, Universal Voltage 3-phase 3W/4W Modbus Meter. SUBMETER ONLY.

The VerifEye™ Series 4100 Meters feature bidirectional monitoring specifically designed for renewable energy applications. The Series 4100 Meters measure power imported from the utility grid and power exported from renewable energy sources like photovoltaic systems. This allows facility managers to properly track energy received and delivered.
UPC Code: 078477701225
Country of Origin : United States

Product Information

  • Product Features

    CT Type : Meter

    CTs Included : No Meter Only

    Communication : ModBus/RTU, Pulse Output

    Enclosure : Indoor

    Meter Configuration : Single Meter

    Product Line : Series 4000

    Product Type : Electric Submeter

  • Electrical Specifications

    Amperage : Not kitted - will work with 100 A - 5000 A Split Core

    Voltage : 347/600V Y and 600V Delta

  • DIN Rail mount for easy installation
  • ANSI 12.20 0.2% Accuracy, IEC 62053-22 Class 0.5S
  • Real energy output and phase loss alarm output
  • One device serves multiple locations
  • User-enabled password protection to protect meter from tampering
  • Bright, backlit LCD for installation in dark areas and viewing real time data
  • System integration via ModBus RTU - RS-485 2-wire with shield
  • CSI Approved for California Solar Initiative
  • UL Rated
  • CE Compliant

Related Videos

Building Manager Online (BMO) - Video - Basic Module - Software for Submetering
Building Manager Online (BMO) - Video - Tenant Billing - Software for Submetering
Building Manager Online (BMO) - Video - Advanced Reporting - Software for Submetering
How to read Current Transformer Ratings for Submeters - Video
Current Transformer (CT) Installation and Orientation for Submeters - Video
Submetering - How to Submeter - Video - Step 1 - Evaluate the Facility
Submetering - How to Submeter - Video - Step 2 - Planning
Submetering - How to Submeter - Video - Step 3 - Submetering System Installation